IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

272

matching recommendations
Reset
NAICS 332722 Bolt, Nut, Screw, Rivet, and Washer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0083 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $166 $18 Not Implemented
BS0083 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,462 $3,018 Not Implemented
BS0083 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,699 $982 Not Implemented
BS0083 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $821 $196 Not Implemented
LE0402 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,174 $1,000 Not Implemented
LE0402 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,845 $1,000 Not Implemented
LE0402 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,004 $8,500 Not Implemented
LE0402 # 04 Y:2015 04 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,700 $21,000 Implemented
LE0402 # 05 Y:2015 05 2015 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,557 $4,800 Implemented
LE0402 # 06 Y:2015 06 2015 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $6,037 $22,000 Implemented
LE0402 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,975 $9,063 Implemented
LE0402 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $4,200 Implemented
OK0924 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,467 $3,653 Implemented
OK0924 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $309 $0 Implemented
OK0924 # 04 Y:2015 04 2015 AIR CONDITION ONLY SPACE NECESSARY $408 $1,137 Implemented
OK0924 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,732 $1,220 Not Implemented
OK0924 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,674 $0 Implemented
OK0924 # 07 Y:2015 07 2015 INSTALL REPLACEMENT DOORS $334 $1,108 Not Implemented
OK0924 # 08 Y:2015 08 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,588 $1,000 Not Implemented
OK0924 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,037 $21,108 Implemented
BD0445 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $898 $600 Not Implemented
BD0445 # 02 Y:2014 02 2014 UPGRADE CONTROLS ON COMPRESSORS $11,901 $20 Not Implemented
BD0445 # 04 Y:2014 04 2014 USE RADIANT HEATER FOR SPOT HEATING $3,480 $3,300 Not Implemented
BD0445 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,412 $1,450 Not Implemented
BD0445 # 05 Y:2014 05 2014 DISCONNECT BALLASTS $2,662 $880 Not Implemented