IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 3328 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0358 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,826 $1,760 n/a
MZ0358 # 07 Y:2024 07 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,887 $14,220 n/a
MZ0358 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,179 $320 n/a
MZ0358 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,050 $2,050 n/a
MZ0358 # 06 Y:2024 06 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,666 $2,000 n/a
MZ0358 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,322 $200 n/a
MZ0358 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,335 $1,200 n/a
MZ0240 # 05 Y:2017 05 2017 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $7,139 $5,400 Implemented
MZ0240 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $806 $5,500 Not Implemented
MZ0240 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,206 $250 Implemented
MZ0240 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $8,183 $2,100 Implemented
MZ0240 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,745 $1,160 Implemented
MZ0240 # 07 Y:2017 07 2017 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $119,328 $208,000 Implemented
MZ0240 # 08 Y:2017 08 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,024 $70,500 Implemented
MZ0240 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,020 $6,000 Implemented
MZ0148 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $546 $2,000 Implemented
MZ0148 # 07 Y:2014 07 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $380 $1,000 Implemented
MZ0148 # 06 Y:2014 06 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,573 $1,700 Not Implemented
MZ0148 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $549 $850 Not Implemented
MZ0148 # 01 Y:2014 01 2014 USE PHOTOCELL CONTROLS $1,021 $980 Implemented
MZ0148 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $1,630 $897 Not Implemented
MZ0148 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $2,225 $4,000 Not Implemented
MZ0085 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,648 $820 Not Implemented
MZ0085 # 02 Y:2012 02 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $79,573 $6,500 Implemented
MZ0085 # 03 Y:2012 03 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $72,621 $8,500 Implemented