IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

253

matching recommendations
Reset
NAICS 3328 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0117 # 02 Y:2020 02 2020 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $20,258 $28,161 Not Implemented
CW0117 # 03 Y:2020 03 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $621 $1,288 Not Implemented
CW0117 # 04 Y:2020 04 2020 HEAT WATER WITH EXHAUST HEAT $1,331 $2,149 Implemented
CW0117 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $2,598 $6,039 Implemented
CW0117 # 06 Y:2020 06 2020 USE A DIFFERENT OR RECYCLED RAW MATERIAL $217,090 $846,410 Implemented
CW0117 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,334 $255 Implemented
CW0117 # 08 Y:2020 08 2020 UPGRADE CONTROLS ON COMPRESSORS $11,576 $32,850 Not Implemented
CW0117 # 09 Y:2020 09 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,222 $15,730 Not Implemented
CW0117 # 10 Y:2020 10 2020 RECOVER WASTE HEAT FROM EQUIPMENT $879 $5,742 Implemented
CW0117 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,860 $6,780 Implemented
WV0534 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,565 $4,150 Not Implemented
WV0534 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $616 $315 Implemented
WV0534 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $474 $256 Implemented
WV0534 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,083 $1,000 Implemented
WV0534 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,026 $4,100 Implemented
WV0534 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,092 $3,000 Not Implemented
WV0534 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $1,196 $1,953 Implemented
WV0534 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $471 $1,125 Implemented
WV0534 # 06 Y:2016 06 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,300 $2,900 Not Implemented
WV0534 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $50 Implemented
WV0534 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,016 $0 Implemented
WV0531 # 09 Y:2016 09 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $956 $1,000 Implemented
WV0531 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $4,010 Implemented
WV0531 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,039 $63,000 Not Implemented
WV0531 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $12,371 $25,305 Implemented