Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,826
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0594 # 04 Y:2025 | 04 | 2025 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $42,706 | $75,000 | n/a |
LE0594 # 08 Y:2025 | 08 | 2025 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $15,529 | $74,000 | n/a |
LE0594 # 06 Y:2025 | 06 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,643 | $16,923 | n/a |
LE0594 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,393 | $1,560 | n/a |
LE0594 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,206 | $17,020 | n/a |
LE0594 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $3,456 | $0 | n/a |
LE0594 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,003 | $22,000 | n/a |
LE0594 # 03 Y:2025 | 03 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,962 | $2,500 | n/a |
UD1100 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,770 | $1,235 | n/a |
UD1100 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $12,387 | $23,400 | n/a |
UD1100 # 06 Y:2025 | 06 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,587 | $0 | n/a |
UD1100 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $879 | $0 | n/a |
UD1100 # 02 Y:2025 | 02 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,520 | $1,237 | n/a |
UD1100 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,007 | $15,430 | n/a |
UD1100 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $5,242 | $7,768 | n/a |
UD1100 # 01 Y:2025 | 01 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $118 | $0 | n/a |
LE0587 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $667 | $2,000 | n/a |
LE0587 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,495 | $190,400 | n/a |
LE0587 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,080 | $15,000 | n/a |
LE0587 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,851 | $6,801 | n/a |
LE0587 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $735 | $2,997 | n/a |
LE0587 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,795 | $1,400 | n/a |
LE0587 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,438 | $0 | n/a |
UU0263 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,105 | $5,100 | n/a |
UU0263 # 01 Y:2025 | 01 | 2025 | INSTALL COMMON HEADER ON COMPRESSORS | $7,583 | $46,630 | n/a |