Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,939
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0382 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $179 | $1,000 | n/a |
MZ0382 # 04 Y:2025 | 04 | 2025 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $149,231 | $825,000 | n/a |
MZ0382 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $595 | $100 | n/a |
MZ0382 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,303 | $4,500 | n/a |
UC2510 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,144 | $1,950 | n/a |
UC2510 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,200 | $343,027 | n/a |
UC2510 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,585 | $50 | n/a |
UC2510 # 06 Y:2024 | 06 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,976 | $24,000 | n/a |
UC2510 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $984 | $0 | n/a |
UC2510 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $273 | $113 | n/a |
TT0336 # 04 Y:2025 | 04 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,724 | $40,000 | n/a |
TT0336 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $19,703 | $159,000 | n/a |
TT0336 # 01 Y:2025 | 01 | 2025 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $21,145 | $30,000 | n/a |
TT0336 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $572 | $60 | n/a |
TT0336 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $153 | $255 | n/a |
TT0336 # 06 Y:2025 | 06 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,830 | $500 | n/a |
TT0336 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $551 | $375 | n/a |
TT0336 # 10 Y:2025 | 10 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $507 | $100 | n/a |
TT0336 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,078 | $400 | n/a |
TT0336 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $355 | $1,600 | n/a |
TT0336 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,640 | $6,680 | n/a |
TT0336 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,201 | $5,250 | n/a |
IP0213 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,494 | $0 | n/a |
IP0213 # 08 Y:2025 | 08 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $48,428 | $56,200 | n/a |
IP0213 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,498 | $13,433 | n/a |