Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0358 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,826 | $1,760 | n/a |
MZ0358 # 07 Y:2024 | 07 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,887 | $14,220 | n/a |
MZ0358 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,179 | $320 | n/a |
MZ0358 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,050 | $2,050 | n/a |
MZ0358 # 06 Y:2024 | 06 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,666 | $2,000 | n/a |
MZ0358 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,322 | $200 | n/a |
MZ0358 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,335 | $1,200 | n/a |
MZ0240 # 05 Y:2017 | 05 | 2017 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $7,139 | $5,400 | Implemented |
MZ0240 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $806 | $5,500 | Not Implemented |
MZ0240 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,206 | $250 | Implemented |
MZ0240 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $8,183 | $2,100 | Implemented |
MZ0240 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,745 | $1,160 | Implemented |
MZ0240 # 07 Y:2017 | 07 | 2017 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $119,328 | $208,000 | Implemented |
MZ0240 # 08 Y:2017 | 08 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,024 | $70,500 | Implemented |
MZ0240 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,020 | $6,000 | Implemented |
MZ0148 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $546 | $2,000 | Implemented |
MZ0148 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $380 | $1,000 | Implemented |
MZ0148 # 06 Y:2014 | 06 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,573 | $1,700 | Not Implemented |
MZ0148 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $549 | $850 | Not Implemented |
MZ0148 # 01 Y:2014 | 01 | 2014 | USE PHOTOCELL CONTROLS | $1,021 | $980 | Implemented |
MZ0148 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $1,630 | $897 | Not Implemented |
MZ0148 # 05 Y:2014 | 05 | 2014 | INSULATE BARE EQUIPMENT | $2,225 | $4,000 | Not Implemented |
MZ0085 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,648 | $820 | Not Implemented |
MZ0085 # 02 Y:2012 | 02 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $79,573 | $6,500 | Implemented |
MZ0085 # 03 Y:2012 | 03 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $72,621 | $8,500 | Implemented |