IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 33281 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0403 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,656 $480 Not Implemented
MI0403 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,149 $40 Implemented
MI0403 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,275 $5,780 Implemented
MI0403 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,718 $2,020 Implemented
MI0403 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $11,648 $5,536 Implemented
MI0403 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $15,827 $43,707 Implemented
MI0403 # 07 Y:2022 07 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,171 $99 Implemented
MI0325 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,332 $4,841 Not Implemented
MI0325 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $979 $3,042 Implemented
MI0325 # 08 Y:2017 08 2017 USE OPTIMUM THICKNESS INSULATION $1,467 $388 Implemented
MI0325 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,220 $1,600 Implemented
MI0325 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,645 $2,520 Implemented
MI0325 # 05 Y:2017 05 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,801 $160 Implemented
MI0325 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,058 $9,700 Not Implemented
MI0325 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,604 $1,660 Implemented
MI0325 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,225 $14,854 Not Implemented
MI0164 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $114,642 $3,960 Implemented
MI0164 # 10 Y:2008 10 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,174 $260 Not Implemented
MI0164 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,992 $1,032 Implemented
MI0164 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,657 $4,400 Not Implemented
MI0164 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,297 $40 Implemented
MI0164 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0164 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,597 $4,400 Implemented
MI0164 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,799 $40 Implemented
MI0164 # 03 Y:2008 03 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,553 $22,366 Not Implemented