IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

671

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0376 # 11 Y:2010 11 2010 HEAT WATER WITH EXHAUST HEAT $35,366 $24,762 Not Implemented
UA3004 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,609 $24,042 Not Implemented
UA3004 # 02 Y:2010 02 2010 USE PHOTOCELL CONTROLS $626 $225 Implemented
UA3004 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $655 $1,000 Implemented
UA3004 # 04 Y:2010 04 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,339 $3,355 Not Implemented
UA3004 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $104 $240 Not Implemented
UA3004 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $83 $400 Not Implemented
WV0406 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,356 $7,809 Not Implemented
WV0406 # 01 Y:2010 01 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $165,791 $87,000 Not Implemented
WV0406 # 02 Y:2010 02 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $75,243 $91,000 Not Implemented
WV0406 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,098 $49,200 Implemented
WV0406 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,767 $65 Not Implemented
WV0406 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,089 $245 Not Implemented
LL0327 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,425 $4,180 Implemented
LL0327 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $30 Implemented
LL0327 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $531 $390 Not Implemented
LL0327 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $245 $390 Not Implemented
LL0327 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $127 $160 Not Implemented
WV0398 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,235 $419 Implemented
WV0398 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $413,866 $803,660 Not Implemented
WV0398 # 02 Y:2009 02 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $165,791 $85,600 Not Implemented
WV0398 # 03 Y:2009 03 2009 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $97,378 $120,000 Not Implemented
WV0398 # 04 Y:2009 04 2009 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $75,243 $72,000 Not Implemented
WV0398 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,098 $44,783 Not Implemented
WV0398 # 06 Y:2009 06 2009 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $11,848 $3,759 Not Implemented