Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 332812 | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0130 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,890 | $100 | Implemented |
UA0130 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,986 | $2,522 | Not Implemented |
UA0130 # 05 Y:2014 | 05 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $6,867 | $4,120 | Not Implemented |
UA0130 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,266 | $0 | Implemented |
UA0130 # 03 Y:2014 | 03 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $2,774 | $200 | Implemented |
UA0130 # 02 Y:2014 | 02 | 2014 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,506 | $6,410 | Not Implemented |
UA0130 # 01 Y:2014 | 01 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $15,715 | $35,154 | Not Implemented |
IP0026 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $70 | Not Implemented |
IP0026 # 08 Y:2014 | 08 | 2014 | OPTIMIZE PLANT POWER FACTOR | $5,683 | $16,847 | Not Implemented |
IP0026 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $553 | $991 | Not Implemented |
IP0026 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $221 | $286 | Not Implemented |
IP0026 # 05 Y:2014 | 05 | 2014 | INSULATE BARE EQUIPMENT | $320 | $300 | Not Implemented |
IP0026 # 04 Y:2014 | 04 | 2014 | REPLACE BOILER | $47,742 | $25,000 | Not Implemented |
IP0026 # 03 Y:2014 | 03 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,175 | $67 | Not Implemented |
IP0026 # 01 Y:2014 | 01 | 2014 | APPLY FOR INVESTMENT INCENTIVES | $6,604 | $0 | Not Implemented |
UM0444 # 01 Y:2014 | 01 | 2014 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $216,000 | $500,000 | Not Implemented |
UM0444 # 02 Y:2014 | 02 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $71,820 | $133,000 | Not Implemented |
UM0444 # 03 Y:2014 | 03 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,306 | $80,000 | Not Implemented |
UM0444 # 04 Y:2014 | 04 | 2014 | USE MINIMUM STEAM OPERATING PRESSURE | $6,638 | $5,000 | Implemented |
UM0444 # 05 Y:2014 | 05 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $104,300 | $208,000 | Not Implemented |