IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0336 # 12 Y:2025 12 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $153 $255 n/a
TT0336 # 11 Y:2025 11 2025 INSTALL OCCUPANCY SENSORS $355 $1,600 n/a
TT0336 # 10 Y:2025 10 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $507 $100 n/a
TT0336 # 09 Y:2025 09 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $551 $375 n/a
TT0336 # 08 Y:2025 08 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $572 $60 n/a
TT0336 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,078 $400 n/a
TT0336 # 06 Y:2025 06 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,830 $500 n/a
TT0336 # 05 Y:2025 05 2025 OPTIMIZE PLANT POWER FACTOR $2,201 $5,250 n/a
TT0336 # 04 Y:2025 04 2025 BURN A LESS EXPENSIVE GRADE OF FUEL $6,724 $40,000 n/a
TT0336 # 03 Y:2025 03 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,640 $6,680 n/a
TT0336 # 02 Y:2025 02 2025 USE BATTERY STORAGE FOR DEMAND CONTROL $19,703 $159,000 n/a
TT0336 # 01 Y:2025 01 2025 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $21,145 $30,000 n/a
TT0088 # 09 Y:2012 09 2012 METER WASTE WATER $3,603 $750 Not Implemented
TT0088 # 10 Y:2012 10 2012 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $19,167 $47,935 Not Implemented
TT0088 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77 $1,014 Not Implemented
TT0088 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,346 $3,350 Not Implemented
TT0088 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $626 $11,880 Not Implemented
TT0088 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,989 $10,200 Not Implemented
TT0088 # 04 Y:2012 04 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $800 $850 Not Implemented
TT0088 # 03 Y:2012 03 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,506 $5,300 Not Implemented
TT0088 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $1,465 $3,978 Not Implemented
TT0088 # 01 Y:2012 01 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $192 $25 Not Implemented
TT0004 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $20,486 $2,500 Implemented
TT0004 # 05 Y:2007 05 2007 REPAIR OR REPLACE STEAM TRAPS $557 $0 Not Implemented
TT0004 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $0 Implemented