IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

735

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0227 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,441 $1,500 Not Implemented
IC0227 # 01 Y:2019 01 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,221 $800 Not Implemented
IC0227 # 05 Y:2019 05 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,871 $28,000 Not Implemented
IC0226 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $60 Not Implemented
IC0226 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,367 $0 Not Implemented
IC0226 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $1,200 Not Implemented
IC0226 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,094 $167 Not Implemented
IC0226 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,608 $4,300 Not Implemented
IC0226 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $689 Not Implemented
IP0123 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $286 $7 Implemented
IP0123 # 02 Y:2019 02 2019 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $248 $0 Implemented
IP0123 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $442 $70 Implemented
IP0123 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $503 $100 Not Implemented
IP0123 # 05 Y:2019 05 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,980 $440 Implemented
IP0123 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,541 $9,685 Not Implemented
IP0123 # 07 Y:2019 07 2019 INSULATE BARE EQUIPMENT $96 $200 Not Implemented
IP0123 # 08 Y:2019 08 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $758 $2,290 Implemented
IP0123 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,165 $13,663 Implemented
IP0123 # 10 Y:2019 10 2019 INSULATE BARE EQUIPMENT $153 $692 Not Implemented
AM0771 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,590 $8,175 Implemented
AM0771 # 02 Y:2019 02 2019 REPLACE BOILER $8,200 $42,760 Implemented
AM0771 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $6,400 $12,960 Implemented
AM0771 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $1,340 Implemented
AM0771 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $950 $0 Not Implemented
AM0771 # 06 Y:2019 06 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $300 $26 Implemented