IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0317 # 13 Y:2025 13 2025 INSULATE BARE EQUIPMENT $2,154 $4,516 n/a
IC0317 # 08 Y:2025 08 2025 USE RADIANT HEATER FOR SPOT HEATING $15,053 $20,087 n/a
IC0317 # 07 Y:2025 07 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $32,668 $258,530 n/a
IC0317 # 03 Y:2025 03 2025 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $930 $0 n/a
IC0317 # 01 Y:2025 01 2025 INSTALL EFFICIENT RECTIFIERS $6,191 $19,124 n/a
IC0317 # 11 Y:2025 11 2025 INSTALL OCCUPANCY SENSORS $151 $425 n/a
IC0317 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $704 $0 n/a
IC0317 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,337 $108 n/a
IC0317 # 12 Y:2025 12 2025 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $11,344 $21,200 n/a
IC0317 # 04 Y:2025 04 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $1,113 n/a
IC0317 # 02 Y:2025 02 2025 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $10,127 $7,240 n/a
IC0317 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $972 $2,234 n/a
IC0317 # 10 Y:2025 10 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $397 $597 n/a
IC0226 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $60 Not Implemented
IC0226 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $1,200 Not Implemented
IC0226 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,367 $0 Not Implemented
IC0226 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $689 Not Implemented
IC0226 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,094 $167 Not Implemented
IC0226 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,608 $4,300 Not Implemented
MZ0144 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $9,563 $12,000 Implemented
MZ0144 # 01 Y:2014 01 2014 COVER OPEN TANKS $6,406 $5,250 Not Implemented
MZ0144 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $824 $900 Implemented
MZ0144 # 04 Y:2014 04 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,431 $4,400 Not Implemented
MZ0144 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,120 $7,400 Implemented
MZ0144 # 06 Y:2014 06 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,940 $5,500 Not Implemented