IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS035 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,986 $2,000 Implemented
MAS035 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,443 $0 Implemented
MAS035 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $525 $1,700 Not Implemented
WV0457 # 12 Y:2012 12 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112 $305 Not Implemented
WV0457 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $330 $50 Implemented
WV0457 # 10 Y:2012 10 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,022 $950 Not Implemented
WV0457 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,194 $150 Not Implemented
WV0457 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $2,620 Not Implemented
WV0457 # 07 Y:2012 07 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,189 $1,000 Implemented
WV0457 # 06 Y:2012 06 2012 DEVELOP A REPAIR/REPLACE POLICY $2,244 $775 Not Implemented
WV0457 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $2,539 $5,407 Implemented
WV0457 # 04 Y:2012 04 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,000 $12,251 Not Implemented
WV0457 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,482 $500 Implemented
WV0457 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,986 $22,500 Implemented
WV0457 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,854 $6,400 Not Implemented
TT0088 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77 $1,014 Not Implemented
TT0088 # 10 Y:2012 10 2012 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $19,167 $47,935 Not Implemented
TT0088 # 09 Y:2012 09 2012 METER WASTE WATER $3,603 $750 Not Implemented
TT0088 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,346 $3,350 Not Implemented
TT0088 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $626 $11,880 Not Implemented
TT0088 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,989 $10,200 Not Implemented
TT0088 # 04 Y:2012 04 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $800 $850 Not Implemented
TT0088 # 03 Y:2012 03 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,506 $5,300 Not Implemented
TT0088 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $1,465 $3,978 Not Implemented
TT0088 # 01 Y:2012 01 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $192 $25 Not Implemented