Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 332813 | Electroplating, Plating, Polishing, Anodizing, and Coloring |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS035 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,986 | $2,000 | Implemented |
MAS035 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,443 | $0 | Implemented |
MAS035 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $525 | $1,700 | Not Implemented |
WV0457 # 12 Y:2012 | 12 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112 | $305 | Not Implemented |
WV0457 # 11 Y:2012 | 11 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $330 | $50 | Implemented |
WV0457 # 10 Y:2012 | 10 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,022 | $950 | Not Implemented |
WV0457 # 09 Y:2012 | 09 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,194 | $150 | Not Implemented |
WV0457 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,415 | $2,620 | Not Implemented |
WV0457 # 07 Y:2012 | 07 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,189 | $1,000 | Implemented |
WV0457 # 06 Y:2012 | 06 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $2,244 | $775 | Not Implemented |
WV0457 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $2,539 | $5,407 | Implemented |
WV0457 # 04 Y:2012 | 04 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,000 | $12,251 | Not Implemented |
WV0457 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,482 | $500 | Implemented |
WV0457 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,986 | $22,500 | Implemented |
WV0457 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,854 | $6,400 | Not Implemented |
TT0088 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77 | $1,014 | Not Implemented |
TT0088 # 10 Y:2012 | 10 | 2012 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $19,167 | $47,935 | Not Implemented |
TT0088 # 09 Y:2012 | 09 | 2012 | METER WASTE WATER | $3,603 | $750 | Not Implemented |
TT0088 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,346 | $3,350 | Not Implemented |
TT0088 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $11,880 | Not Implemented |
TT0088 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,989 | $10,200 | Not Implemented |
TT0088 # 04 Y:2012 | 04 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $800 | $850 | Not Implemented |
TT0088 # 03 Y:2012 | 03 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,506 | $5,300 | Not Implemented |
TT0088 # 02 Y:2012 | 02 | 2012 | OPTIMIZE PLANT POWER FACTOR | $1,465 | $3,978 | Not Implemented |
TT0088 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $192 | $25 | Not Implemented |