Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 332813 | Electroplating, Plating, Polishing, Anodizing, and Coloring |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0111 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,378 | $0 | Implemented |
IP0111 # 02 Y:2018 | 02 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $767 | $0 | Not Implemented |
IP0111 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $780 | $217 | Implemented |
IP0111 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,101 | $893 | Implemented |
IP0111 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,069 | $26,837 | Not Implemented |
IP0111 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $280 | $801 | Not Implemented |
IP0111 # 07 Y:2018 | 07 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $95 | $295 | Not Implemented |
IP0111 # 08 Y:2018 | 08 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,310 | $4,238 | Not Implemented |
IP0111 # 09 Y:2018 | 09 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $180 | $679 | Implemented |
WV0567 # 01 Y:2018 | 01 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,443 | $23,150 | Not Implemented |
WV0567 # 02 Y:2018 | 02 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,472 | $5,600 | Not Implemented |
WV0567 # 03 Y:2018 | 03 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,322 | $15,000 | Not Implemented |
WV0567 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $5,896 | $6,014 | Implemented |
WV0567 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,472 | $2,150 | Not Implemented |
WV0567 # 06 Y:2018 | 06 | 2018 | RECYCLE WHITE WATER | $4,061 | $450 | Implemented |
WV0567 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $1,487 | $1,690 | Implemented |
WV0567 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $495 | $500 | Implemented |
WV0567 # 09 Y:2018 | 09 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $408 | $563 | Implemented |
CL1803 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,516 | $9,852 | Implemented |
CL1803 # 01 Y:2018 | 01 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $40,277 | $14,300 | Implemented |
CL1803 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,656 | $2,080 | Implemented |
CL1803 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $386 | $0 | Implemented |
SD0561 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,515 | $1,500 | Implemented |
SD0561 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,493 | $3,414 | Not Implemented |
SD0561 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $1,167 | $2,318 | Not Implemented |