IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1106 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,422 $50,026 Implemented
OK1106 # 05 Y:2024 05 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,777 $4,495 Implemented
OK1059 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Implemented
OK1059 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,353 $8,612 Implemented
OK0906 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,273 $600 Implemented
OK0852 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $1,388 Implemented
OK0852 # 11 Y:2013 11 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $550 Implemented
OK0852 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $838 $3,718 Implemented
OK0852 # 06 Y:2013 06 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,139 $344 Implemented
OK0852 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,621 $2,310 Implemented
OK0795 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,751 $1,680 Implemented
OK0795 # 07 Y:2010 07 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $896 $5,000 Implemented
OK0795 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,677 $1,100 Implemented
OK0782 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $354 Implemented
OK0782 # 08 Y:2009 08 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $700 $1,825 Implemented
OK0782 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,733 $0 Implemented
OK0782 # 07 Y:2009 07 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,815 $820 Implemented
OK0758 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,290 $1,000 Implemented
OK0758 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,316 $600 Implemented
OK0758 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,699 $51,819 Implemented
OK0686 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $2,550 Implemented
OK0686 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,153 $36,618 Implemented
OK0686 # 04 Y:2004 04 2004 INSTALL SET-BACK TIMERS $1,577 $1,320 Implemented
OK0686 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $3,350 $1,136 Implemented
OK0686 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,472 $262 Implemented