IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0154 # 03 Y:2014 03 2014 USE PHOTOCELL CONTROLS $4,064 $6,700 Not Implemented
MZ0154 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,059 $1,260 Implemented
MZ0154 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,821 $1,740 Not Implemented
MZ0154 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $383 $850 Implemented
TT0116 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $837 $763 Not Implemented
TT0116 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $1,609 $5,920 Not Implemented
TT0116 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,077 $700 Not Implemented
TT0116 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,073 $12,258 Implemented
TT0089 # 04 Y:2012 04 2012 INSTALL SKYLIGHTS $7,188 $96,000 Not Implemented
TT0089 # 03 Y:2012 03 2012 USE SOLAR HEAT FOR HEAT $25,369 $109,680 Not Implemented
TT0089 # 02 Y:2012 02 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,031 $89,180 Not Implemented
TT0089 # 01 Y:2012 01 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,022 $6,293 Not Implemented
TT0069 # 04 Y:2011 04 2011 OPTIMIZE PLANT POWER FACTOR $985 $1,980 Not Implemented
TT0069 # 05 Y:2011 05 2011 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,083 $4,900 Not Implemented
TT0069 # 03 Y:2011 03 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $549 $600 Not Implemented
TT0069 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,271 $3,600 Not Implemented
TT0069 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,768 $0 Not Implemented
TT0040 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,970 $217,270 Not Implemented
TT0040 # 09 Y:2009 09 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,500 $0 Implemented
TT0040 # 08 Y:2009 08 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,000 $0 Implemented
TT0040 # 07 Y:2009 07 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $32,280 $40,000 Not Implemented
TT0040 # 06 Y:2009 06 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $39,750 $0 Implemented
TT0040 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,450 $800 Implemented
TT0040 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,600 $0 Implemented
TT0040 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,648 $0 Implemented