IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0795 # 07 Y:2010 07 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $896 $5,000 Implemented
OK0795 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,751 $1,680 Implemented
OK0795 # 09 Y:2010 09 2010 INSTALL REPLACEMENT DOORS $24,009 $51,300 Not Implemented
OK0782 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $354 Implemented
OK0782 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,732 $3,742 Not Implemented
OK0782 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,733 $0 Implemented
OK0782 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,005 $7,542 Not Implemented
OK0782 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,300 $11,120 Not Implemented
OK0782 # 06 Y:2009 06 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $804 $4,800 Not Implemented
OK0782 # 07 Y:2009 07 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,815 $820 Implemented
OK0782 # 08 Y:2009 08 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $700 $1,825 Implemented
OK0758 # 01 Y:2008 01 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,272 $20,990 Not Implemented
OK0758 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,470 $6,841 Not Implemented
OK0758 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,699 $51,819 Implemented
OK0758 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $215 $1,762 Not Implemented
OK0758 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,290 $1,000 Implemented
OK0758 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $144 $754 Not Implemented
OK0758 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,316 $600 Implemented
OK0686 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,360 $160 Not Implemented
OK0686 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,472 $262 Implemented
OK0686 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $3,350 $1,136 Implemented
OK0686 # 04 Y:2004 04 2004 INSTALL SET-BACK TIMERS $1,577 $1,320 Implemented
OK0686 # 05 Y:2004 05 2004 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $70,533 $81,950 Not Implemented
OK0686 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,153 $36,618 Implemented
OK0686 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $2,550 Implemented