IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

230

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0341 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,952 $2 Not Implemented
BD0341 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,036 $1,501 Not Implemented
BD0341 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $79,942 $60,001 Not Implemented
BD0341 # 09 Y:2008 09 2008 REPLACE BOILER $49,861 $10,001 Implemented
BD0341 # 10 Y:2008 10 2008 REPLACE BOILER $6,664 $2,001 Implemented
BD0341 # 11 Y:2008 11 2008 MAINTAIN MACHINES TO REDUCE LEAKS $3,717 $1,001 Not Implemented
BD0341 # 12 Y:2008 12 2008 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,560 $601 Not Implemented
BD0340 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93,388 $17,061 Not Implemented
BD0340 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $4,786 $1,501 Not Implemented
BD0340 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $381 Not Implemented
BD0340 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,817 $2 Not Implemented
BD0340 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,013 $1,501 Not Implemented
BD0340 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,540 $501 Not Implemented
BD0340 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,077 $2,001 Not Implemented
BD0340 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $8,829 $30,001 Not Implemented
BD0340 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,245 $12,000 Not Implemented
BD0340 # 10 Y:2008 10 2008 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $662,215 $1,001 Not Implemented
BD0327 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,018 $1,000 Not Implemented
BD0327 # 02 Y:2007 02 2007 USE SYNTHETIC LUBRICANT $4,257 $600 Not Implemented
BD0327 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,520 $600 Not Implemented
BD0327 # 04 Y:2007 04 2007 INSTALL REPLACEMENT DOORS $7,558 $20,000 Not Implemented
BD0327 # 05 Y:2007 05 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $15,124 $6,800 Not Implemented
BD0327 # 06 Y:2007 06 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,271 $500 Not Implemented
BD0327 # 07 Y:2007 07 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,763 $0 Not Implemented
BD0327 # 08 Y:2007 08 2007 USE PHOTOCELL CONTROLS $36,411 $10,000 Not Implemented