IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,304

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0348 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $145 $356 Implemented
LL0348 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $35 $56 Implemented
WV0423 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,866 $52,636 Not Implemented
WV0423 # 02 Y:2011 02 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,406 $12,655 Not Implemented
WV0423 # 03 Y:2011 03 2011 DEVELOP A REPAIR/REPLACE POLICY $1,913 $1,429 Not Implemented
WV0423 # 04 Y:2011 04 2011 REPAIR AND ELIMINATE STEAM LEAKS $1,472 $626 Implemented
WV0423 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,173 $2,443 Implemented
WV0423 # 06 Y:2011 06 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,041 $1,000 Implemented
WV0423 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $521 $89 Implemented
WV0423 # 08 Y:2011 08 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $428 $183 Implemented
WV0423 # 09 Y:2011 09 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $343 $177 Implemented
WV0423 # 10 Y:2011 10 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $296 $1,148 Not Implemented
WV0423 # 11 Y:2011 11 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $267 Not Implemented
WV0423 # 12 Y:2011 12 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $272 $139 Implemented
WV0423 # 13 Y:2011 13 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $216 $200 Not Implemented
SD0505 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,430 $0 Not Implemented
SD0505 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,022 $2,400 Implemented
SD0505 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,899 $10,561 Not Implemented
SD0505 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,230 $18,098 Not Implemented
SD0505 # 05 Y:2011 05 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,773 $17,794 Not Implemented
TT0063 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $0 Not Implemented
TT0063 # 02 Y:2011 02 2011 REPAIR OR REPLACE STEAM TRAPS $6,712 $4,800 Not Implemented
TT0063 # 03 Y:2011 03 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,238 $0 Not Implemented
TT0063 # 04 Y:2011 04 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $900 $1,050 Implemented
TT0063 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $8,057 $30,500 Not Implemented