IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,304

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0062 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,105 $15,000 Implemented
MZ0062 # 09 Y:2011 09 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,053 $9,000 Implemented
MZ0062 # 10 Y:2011 10 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,502 $30,000 Not Implemented
MZ0062 # 11 Y:2011 11 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,836 $10,000 Implemented
MZ0062 # 12 Y:2011 12 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $62 $60 Not Implemented
MZ0062 # 13 Y:2011 13 2011 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $91 $300 Implemented
MZ0062 # 14 Y:2011 14 2011 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $11,657 $150,000 Implemented
MZ0062 # 15 Y:2011 15 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,598 $1,500 Not Implemented
MZ0062 # 16 Y:2011 16 2011 UPGRADE CONTROLS ON COMPRESSORS $11,500 $18,000 Implemented
LL0340 # 01 Y:2010 01 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,551 $1,457 Implemented
LL0340 # 02 Y:2010 02 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,537 $450 Not Implemented
LL0340 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,760 $1,600 Implemented
LL0340 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $4,851 $210 Implemented
LL0340 # 05 Y:2010 05 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,310 $420 Implemented
LL0340 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,383 $8 Implemented
LL0340 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $895 $1,080 Not Implemented
LL0340 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $466 $315 Not Implemented
LL0340 # 09 Y:2010 09 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $356 $425 Implemented
LL0340 # 10 Y:2010 10 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $225 $312 Not Implemented
GT0877 # 01 Y:2010 01 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $250,000 Not Implemented
UM0373 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,156 $44,196 Not Implemented
UM0373 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,961 $200 Not Implemented
UM0373 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,127 $4,000 Not Implemented
UM0373 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $870 $828 Not Implemented
UM0373 # 05 Y:2010 05 2010 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,428 $1,040 Not Implemented