IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,304

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0373 # 06 Y:2010 06 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,651 $6,300 Not Implemented
OK0795 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $41,350 $68,550 Not Implemented
OK0795 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,321 $4,015 Not Implemented
OK0795 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,567 $513 Not Implemented
OK0795 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,677 $1,100 Implemented
OK0795 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,244 $11,715 Not Implemented
OK0795 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,260 $159,982 Not Implemented
OK0795 # 07 Y:2010 07 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $896 $5,000 Implemented
OK0795 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,751 $1,680 Implemented
OK0795 # 09 Y:2010 09 2010 INSTALL REPLACEMENT DOORS $24,009 $51,300 Not Implemented
GT0874 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,133 $1,250 Implemented
GT0874 # 02 Y:2010 02 2010 USE SYNTHETIC LUBRICANT $1,632 $0 Not Implemented
GT0874 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $53,185 $6,187 Not Implemented
GT0874 # 04 Y:2010 04 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,159 $2,883 Implemented
GT0874 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,038 $20,250 Not Implemented
GT0874 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,115 $38,366 Not Implemented
GT0874 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,744 $119,989 Implemented
GT0874 # 08 Y:2010 08 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $177,900 Not Implemented
WV0411 # 01 Y:2010 01 2010 REDESIGN PROCESS $11,522 $20,345 Not Implemented
WV0411 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,172 $6,123 Implemented
WV0411 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,958 $3,705 Implemented
WV0411 # 04 Y:2010 04 2010 USE RADIANT HEATER FOR SPOT HEATING $2,081 $3,392 Not Implemented
AM0577 # 01 Y:2010 01 2010 INSULATE BARE EQUIPMENT $33,500 $1,800 Implemented
AM0577 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,500 $9,155 Implemented
AM0577 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $6,410 $21,100 Implemented