Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,258
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0525 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,101 | $350 | Not Implemented |
SU0525 # 06 Y:2022 | 06 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,807 | $3,000 | Not Implemented |
SU0525 # 07 Y:2022 | 07 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $12,346 | $12,588 | Not Implemented |
SU0525 # 08 Y:2022 | 08 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $305 | $664 | Not Implemented |
SU0525 # 09 Y:2022 | 09 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $207 | $487 | Not Implemented |
LT8370 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,372 | $1,800 | n/a |
LT8370 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,034 | $0 | n/a |
LT8370 # 03 Y:2023 | 03 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $24,363 | $0 | n/a |
LT8370 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,864 | $8,022 | n/a |
CI0002 # 01 Y:2022 | 01 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $33,479 | $80,000 | n/a |
CI0002 # 02 Y:2022 | 02 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $27,300 | $24,600 | n/a |
CI0002 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,201 | $1,800 | n/a |
CI0002 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,649 | $30,000 | n/a |
CI0002 # 05 Y:2022 | 05 | 2022 | UPGRADE CONVEYORS | $3,825 | $8,040 | n/a |
CI0002 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,680 | $0 | n/a |
CI0002 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,733 | $2,167 | n/a |
CI0002 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,717 | $2,625 | n/a |
CI0002 # 09 Y:2022 | 09 | 2022 | USE PHOTOCELL CONTROLS | $1,322 | $1,350 | n/a |
MZ0326 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,449 | $3,200 | Implemented |
MZ0326 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,611 | $4,700 | Not Implemented |
MZ0326 # 03 Y:2022 | 03 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,085 | $144 | Implemented |
MZ0326 # 04 Y:2022 | 04 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $874 | $140 | Not Implemented |
MZ0326 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,930 | $12,076 | Implemented |
MZ0326 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,106 | $2,244 | Implemented |
MZ0326 # 07 Y:2022 | 07 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $597 | $580 | Implemented |