IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0016 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,000 $4,500 Not Implemented
NL0016 # 07 Y:2018 07 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,600 $90,000 Not Implemented
NL0016 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,700 $15,500 Implemented
NL0016 # 08 Y:2018 08 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,200 $0 Not Implemented
NL0016 # 04 Y:2018 04 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,600 $5,000 Not Implemented
NL0016 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $33,100 $0 Not Implemented
NL0016 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,400 $160,000 Implemented
NL0016 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,800 $1,000 Not Implemented
IA0538 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,318 $8,045 Not Implemented
IA0538 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $534 $729 Not Implemented
IA0538 # 09 Y:2015 09 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,169 $450 Not Implemented
IA0538 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $1,742 $1,304 Not Implemented
IA0538 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,825 $7,458 Not Implemented
IA0538 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,970 $793 Not Implemented
IA0538 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,318 $175 Not Implemented
IA0538 # 03 Y:2015 03 2015 REPAIR AND ELIMINATE STEAM LEAKS $4,376 $775 Not Implemented
IA0538 # 02 Y:2015 02 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,403 $11,520 Not Implemented
IA0538 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,018 $140 Not Implemented
IA0510 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $7,547 $2,769 Not Implemented
IA0510 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,760 $600 Not Implemented
IA0510 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,742 $30,000 Not Implemented
IA0510 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,748 $7,018 Not Implemented
IA0510 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,723 $30 Not Implemented
IA0510 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,538 $30,502 Not Implemented
IA0510 # 01 Y:2013 01 2013 REPAIR OR REPLACE STEAM TRAPS $58,322 $6,395 Not Implemented