Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0140 # 06 Y:2020 | 06 | 2020 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $479 | $1,149 | Not Implemented |
BS0140 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,475 | $2,808 | Not Implemented |
BS0140 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,837 | $642 | Implemented |
BS0140 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,058 | $0 | Implemented |
BS0140 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $466 | $319 | Implemented |
BS0140 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,952 | $4,513 | Implemented |
BS0048 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,926 | $9,550 | Implemented |
BS0048 # 10 Y:2015 | 10 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $305 | $20 | Not Implemented |
BS0048 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $406 | $722 | Implemented |
BS0048 # 08 Y:2015 | 08 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $168 | $805 | Implemented |
BS0048 # 07 Y:2015 | 07 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $965 | $175 | Implemented |
BS0048 # 06 Y:2015 | 06 | 2015 | INSULATE BARE EQUIPMENT | $1,969 | $3,083 | Implemented |
BS0048 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $181 | $540 | Not Implemented |
BS0048 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $1,240 | $1,650 | Not Implemented |
BS0048 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,403 | $5,220 | Implemented |
BS0048 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,298 | $28,509 | Implemented |
OR0523 # 01 Y:2007 | 01 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $35,000 | $60,000 | Implemented |
OR0523 # 02 Y:2007 | 02 | 2007 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $77,000 | $5,000 | Not Implemented |
OR0523 # 03 Y:2007 | 03 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,350,000 | $32,700 | Not Implemented |
OR0523 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,220 | $1,160 | Implemented |
OR0523 # 05 Y:2007 | 05 | 2007 | COVER OPEN TANKS | $3,000 | $9,000 | Not Implemented |