IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

762

matching recommendations
Reset
NAICS 33291 Metal Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0758 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,470 $6,841 Not Implemented
OK0758 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,699 $51,819 Implemented
OK0758 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $215 $1,762 Not Implemented
OK0758 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,290 $1,000 Implemented
OK0758 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $144 $754 Not Implemented
OK0758 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,316 $600 Implemented
SD0394 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $72,155 $103,750 Not Implemented
SD0394 # 02 Y:2007 02 2007 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $33,374 $226,540 Not Implemented
SD0394 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,868 $3,046 Not Implemented
SD0394 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,578 $0 Not Implemented
SD0394 # 05 Y:2007 05 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $302 $200 Not Implemented
MS0304 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289,291 $222,009 Implemented
MS0304 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $118,243 $1,820 Implemented
MS0304 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,366 $16,063 Implemented
MS0304 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $7,010 $153 Implemented
LE0242 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $734,219 $1,251,036 Implemented
LE0242 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $22,987 $20,000 Implemented
LE0242 # 03 Y:2006 03 2006 REUSE / RECYCLE/ SELL PAPER PRODUCTS $7,219 $960 Implemented
LE0242 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,843 $1,000 Implemented
LE0242 # 05 Y:2006 05 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,240 $6,400 Implemented
LE0242 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,001 $2,000 Implemented
LE0242 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $996 $1,000 Implemented
LE0242 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $152 $75 Implemented
LE0242 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $651 $450 Not Implemented
LE0242 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,990 $8,750 Implemented