IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

762

matching recommendations
Reset
NAICS 33291 Metal Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0243 # 18 Y:2003 18 2003 PAY BILLS ON TIME TO AVOID LATE FEES $320 $0 Not Implemented
SU0166 # 01 Y:2003 01 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,012 $232 Not Implemented
SU0166 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,388 $480 Not Implemented
SU0166 # 03 Y:2003 03 2003 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $28,125 $10,016 Implemented
SU0166 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,270 $24,797 Not Implemented
SU0166 # 05 Y:2003 05 2003 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $24,000 $19,912 Not Implemented
SU0166 # 06 Y:2003 06 2003 USE EXISTING DAM TO GENERATE ELECTRICITY $49,025 $132,000 Not Implemented
SU0166 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,000 $68,560 Implemented
UU0050 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,216 $5,500 Not Implemented
UU0050 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,838 $2,000 Not Implemented
UU0050 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,640 $4,342 Not Implemented
UU0050 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,075 $420 Not Implemented
UU0050 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $177 $390 Not Implemented
UU0050 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,400 $0 Not Implemented
UU0050 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,684 $895 Not Implemented
UU0050 # 08 Y:2003 08 2003 OPTIMIZE PLANT POWER FACTOR $5,144 $9,200 Not Implemented
LL0171 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,294 $4,920 Implemented
LL0171 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $3,678 $364 Not Implemented
LL0171 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,316 $270 Implemented
LL0171 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,189 $1,050 Implemented
LL0171 # 05 Y:2003 05 2003 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,170,000 $15,240 Implemented
LL0171 # 06 Y:2003 06 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,125 $318 Implemented
OK0666 # 01 Y:2003 01 2003 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $15,468 $30,000 Not Implemented
OK0666 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $18,000 $0 Not Implemented
OK0666 # 03 Y:2003 03 2003 INSTALL SET-BACK TIMERS $11,925 $1,200 Not Implemented