IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
NAICS 33291 Metal Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0100 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $965 $200 Implemented
TA0100 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $0 Implemented
TA0100 # 08 Y:2005 08 2005 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $850 $0 Implemented
TA0100 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,925 $205 Implemented
TA0100 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,280 $1,485 Not Implemented
TA0100 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,530 $570 Implemented
TA0100 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $2,400 $995 Implemented
TA0100 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,111 $7,705 Not Implemented
TA0100 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $15,690 $1,015 Implemented
TA0100 # 01 Y:2005 01 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $136,425 $38,485 Not Implemented
LM0104 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $300 Not Implemented
LM0104 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,769 $0 Not Implemented
LM0104 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,554 $7,000 Implemented
LM0104 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,080 $787 Implemented
LM0104 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $920 $250 Not Implemented
SD0369 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,896 $10,102 Implemented
SD0369 # 01 Y:2005 01 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $169,717 $252,000 Not Implemented
SD0369 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,877 $12,575 Not Implemented
SD0369 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,639 $648 Not Implemented
SD0369 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $285 $161 Implemented
SD0369 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $395 $80 Implemented
SD0369 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,291 $0 Implemented
SD0369 # 08 Y:2005 08 2005 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,744 $17,000 Not Implemented
SD0367 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,834 $15,130 Not Implemented
SD0367 # 03 Y:2005 03 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,652 $8,000 Not Implemented