Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 33291 | Metal Valve Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0442 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $597 | $1,566 | Not Implemented |
SD0442 # 05 Y:2011 | 05 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,760 | $26,500 | Not Implemented |
SD0442 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,022 | $1,900 | Not Implemented |
SD0442 # 03 Y:2011 | 03 | 2011 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $247 | $30 | Not Implemented |
SD0442 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,100 | $100 | Not Implemented |
SD0442 # 01 Y:2011 | 01 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $727 | $100 | Not Implemented |
LL0348 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,376 | $12,200 | Implemented |
LL0348 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $145 | $356 | Implemented |
LL0348 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $366 | $3,220 | Implemented |
LL0348 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $605 | $4,020 | Implemented |
LL0348 # 04 Y:2011 | 04 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $935 | $1,838 | Not Implemented |
LL0348 # 03 Y:2011 | 03 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,789 | $5,670 | Implemented |
LL0348 # 01 Y:2011 | 01 | 2011 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $102,711 | $10,348 | Implemented |
LL0348 # 08 Y:2011 | 08 | 2011 | INSULATE BARE EQUIPMENT | $35 | $56 | Implemented |
WV0423 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $1,173 | $2,443 | Implemented |
WV0423 # 04 Y:2011 | 04 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $1,472 | $626 | Implemented |
WV0423 # 03 Y:2011 | 03 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $1,913 | $1,429 | Not Implemented |
WV0423 # 02 Y:2011 | 02 | 2011 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,406 | $12,655 | Not Implemented |
WV0423 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,866 | $52,636 | Not Implemented |
WV0423 # 06 Y:2011 | 06 | 2011 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,041 | $1,000 | Implemented |
WV0423 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $521 | $89 | Implemented |
WV0423 # 11 Y:2011 | 11 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $267 | Not Implemented |
WV0423 # 13 Y:2011 | 13 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $216 | $200 | Not Implemented |
WV0423 # 08 Y:2011 | 08 | 2011 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $428 | $183 | Implemented |
WV0423 # 09 Y:2011 | 09 | 2011 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $343 | $177 | Implemented |