Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
40
matching recommendationsNAICS | 33291 | Metal Valve Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0525 # 09 Y:2022 | 09 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $207 | $487 | Not Implemented |
SU0525 # 08 Y:2022 | 08 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $305 | $664 | Not Implemented |
SU0525 # 07 Y:2022 | 07 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $12,346 | $12,588 | Not Implemented |
SU0525 # 06 Y:2022 | 06 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,807 | $3,000 | Not Implemented |
SU0525 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,101 | $350 | Not Implemented |
SU0525 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,215 | $2,239 | Not Implemented |
SU0525 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,804 | $450 | Not Implemented |
SU0525 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $108 | $13 | Not Implemented |
SU0525 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,482 | $0 | Not Implemented |
MZ0326 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,611 | $4,700 | Not Implemented |
MZ0326 # 12 Y:2022 | 12 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,151 | $600 | Not Implemented |
MZ0326 # 11 Y:2022 | 11 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $384,733 | $2,868,753 | Implemented |
MZ0326 # 10 Y:2022 | 10 | 2022 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,954 | $1,170 | Not Implemented |
MZ0326 # 09 Y:2022 | 09 | 2022 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $10,442 | $18,650 | Not Implemented |
MZ0326 # 08 Y:2022 | 08 | 2022 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $116,541 | $552,315 | Not Implemented |
MZ0326 # 07 Y:2022 | 07 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $597 | $580 | Implemented |
MZ0326 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,106 | $2,244 | Implemented |
MZ0326 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,930 | $12,076 | Implemented |
MZ0326 # 04 Y:2022 | 04 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $874 | $140 | Not Implemented |
MZ0326 # 03 Y:2022 | 03 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,085 | $144 | Implemented |
MZ0326 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,449 | $3,200 | Implemented |
TT0276 # 01 Y:2022 | 01 | 2022 | ADOPT IN-HOUSE MATERIAL GENERATION | $42,153 | $40,000 | Not Implemented |
TT0276 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $125,911 | $145,300 | Not Implemented |
TT0276 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $37,334 | $25,000 | Not Implemented |
TT0276 # 04 Y:2022 | 04 | 2022 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $35,279 | $40,000 | Not Implemented |