Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
296
matching recommendationsNAICS | 332911 | Industrial Valve Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0554 # 02 Y:2024 | 02 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,907 | $0 | n/a |
SU0554 # 03 Y:2024 | 03 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $124 | $0 | n/a |
SU0554 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $82,048 | $526,750 | n/a |
SU0554 # 04 Y:2024 | 04 | 2024 | DISCONNECT BALLASTS | $25 | $0 | n/a |
SU0554 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,419 | $54 | n/a |
SU0554 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,596 | $0 | n/a |
SU0554 # 05 Y:2024 | 05 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,553 | $84 | n/a |
SU0554 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $355 | $466 | n/a |
SU0554 # 09 Y:2024 | 09 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,437 | $105,375 | n/a |
UA0284 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $310 | $88 | n/a |
UA0284 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,690 | $13,427 | n/a |
UA0284 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,762 | $8,114 | n/a |
UA0284 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $6,430 | $1,437 | n/a |
UA0284 # 03 Y:2024 | 03 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,801 | $783 | n/a |
UA0284 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $479 | $500 | n/a |
OK1106 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,422 | $50,026 | Implemented |
OK1106 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,554 | $187,200 | Not Implemented |
OK1106 # 03 Y:2024 | 03 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $2,649 | $5,850 | Not Implemented |
OK1106 # 04 Y:2024 | 04 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,650 | $8,580 | Not Implemented |
OK1106 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $122 | $602 | Not Implemented |
OK1106 # 05 Y:2024 | 05 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,777 | $4,495 | Implemented |
OK1106 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $149 | $0 | Not Implemented |
LS2404 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,771 | $3,080 | Implemented |
LS2404 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $135 | Implemented |
LS2404 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,008 | $75 | Not Implemented |