IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0497 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,793 $4,200 Not Implemented
LE0497 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,727 $10,000 Not Implemented
LE0497 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,231 $32,000 Not Implemented
LE0497 # 04 Y:2020 04 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $2,905 $5,000 Not Implemented
LE0497 # 05 Y:2020 05 2020 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,765 $4,600 Not Implemented
LE0497 # 06 Y:2020 06 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,520 $13,000 Not Implemented
SU0479 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $453 $301 Not Implemented
SU0479 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,382 $383 Not Implemented
SU0479 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $584 $500 Implemented
SU0479 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $733 $0 Implemented
SU0479 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,267 $113 Not Implemented
SU0479 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $6,520 $500 Implemented
SU0479 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,486 $300 Implemented
SU0479 # 08 Y:2019 08 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $423 $714 Not Implemented
SU0434 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,568 $0 Not Implemented
SU0434 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $3,148 Not Implemented
SU0434 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $507 Implemented
SU0434 # 03 Y:2017 03 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,568 $2,420 Implemented
SU0434 # 02 Y:2017 02 2017 ELIMINATE/REDUCE AN OPERATION $22,994 $2,160 Not Implemented
SU0382 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $68 $324 Not Implemented
SU0382 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $394 $1,415 Not Implemented
SU0382 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $461 $1,590 Not Implemented
SU0382 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,679 $10,400 Not Implemented
SU0382 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $394 $320 Not Implemented
SU0382 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,982 $1,901 Not Implemented