IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0036 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,387 $40,768 Implemented
UA0036 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $6,452 $10,320 Not Implemented
UA0036 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $912 $1,500 Implemented
UA0036 # 07 Y:2009 07 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,637 $17,500 Not Implemented
UA0036 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,392 $0 Implemented
UA0036 # 08 Y:2009 08 2009 USE PHOTOCELL CONTROLS $453 $1,337 Not Implemented
UA0031 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $1,573 $300 Not Implemented
UA0031 # 02 Y:2009 02 2009 USE PHOTOCELL CONTROLS $3,768 $1,894 Not Implemented
UA0031 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $1,500 Implemented
UA0031 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,782 $1,385 Not Implemented
UA0031 # 08 Y:2009 08 2009 INSULATE BARE EQUIPMENT $350 $610 Implemented
UA0031 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,868 $0 Not Implemented
UA0031 # 03 Y:2009 03 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,044 $510 Implemented
UA0031 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,812 $41,878 Implemented
UA0019 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $4,299 Not Implemented
UA0019 # 06 Y:2008 06 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,660 $0 Implemented
UA0019 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $377 $520 Implemented
UA0019 # 08 Y:2008 08 2008 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,641 $11,901 Not Implemented
UA0019 # 09 Y:2008 09 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,953 $0 Not Implemented
UA0019 # 10 Y:2008 10 2008 USE RADIANT HEATER FOR SPOT HEATING $46,005 $22,000 Not Implemented
UA0019 # 11 Y:2008 11 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $48,714 $9,100 Not Implemented
UA0019 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,534 $106,743 Not Implemented
UA0019 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $426 $2,016 Implemented
UA0019 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,527 $0 Implemented
UA0019 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,934 $3,000 Implemented