Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0171 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $682 $2,268 Implemented
WM0171 # 06 Y:2021 06 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,495 $5,000 Not Implemented
WM0171 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $844 Implemented
WM0171 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,638 $0 Not Implemented
WM0171 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,771 $1,090 Not Implemented
WM0171 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,815 $1,500 Implemented
WM0171 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,582 $3,000 Implemented
WI0525 # 02 Y:2006 02 2006 MODIFY WORKLOAD $11,666 $9,000 Not Implemented
WI0525 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,775 $23,040 Not Implemented
WI0525 # 03 Y:2006 03 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,600 $0 Not Implemented
WI0525 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $3,880 $0 Not Implemented
WI0525 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $185 $400 Not Implemented
WI0500 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,252 $2,032 n/a
WI0500 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,092 $208 n/a
WI0500 # 05 Y:2005 05 2005 IMPROVE LUBRICATION PRACTICES $4,137 $4,810 n/a
WI0500 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,380 $0 n/a
WI0500 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,522 $640 n/a
WI0500 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,617 $52,200 n/a
WI0500 # 01 Y:2005 01 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $57,577 $25,000 n/a
WI0455 # 04 Y:2003 04 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,787 $0 Not Implemented
WI0455 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,687 $1,000 Not Implemented
WI0455 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,503 $2,000 Not Implemented
WI0455 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,710 $2,500 Implemented
WI0455 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $716 $0 Not Implemented
WI0455 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $1,240 Not Implemented