IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0186 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,297 $60 Implemented
UA0186 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,615 $4,645 Implemented
UA0186 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,673 $500 Not Implemented
UA0186 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $1,872 $740 Implemented
UA0186 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,247 $52,665 Not Implemented
AM0738 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $23,860 $39,900 Implemented
AM0738 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,030 $41,200 Implemented
AM0738 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,870 $3,000 Implemented
AM0738 # 04 Y:2017 04 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $10,870 $19,400 Implemented
AM0738 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $10,990 $9,760 Implemented
MA0780 # 03 Y:2017 03 2017 USE OPTIMUM THICKNESS INSULATION $575 $865 Not Implemented
MA0780 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $100 Not Implemented
MA0780 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $66,074 $629,413 Not Implemented
OK0967 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,854 $3,960 Not Implemented
OK0967 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,380 $6,786 Not Implemented
OK0967 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,739 $2,695 Not Implemented
OK0967 # 07 Y:2017 07 2017 INSTALL SET-BACK TIMERS $1,719 $1,020 Not Implemented
OK0967 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,932 $35,800 Not Implemented
OK0967 # 09 Y:2017 09 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,124 $30,000 Not Implemented
OK0967 # 08 Y:2017 08 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $687 $2,800 Not Implemented
OK0967 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,303 $7,634 Not Implemented
OK0967 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $776 $2,508 Not Implemented
GT0902 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $50 $197 Implemented
GT0902 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,435 $6,000 Not Implemented
GT0902 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,872 $6,000 Not Implemented