IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
NAICS 332991 Ball and Roller Bearing Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0089 # 04 Y:2012 04 2012 INSTALL SKYLIGHTS $7,188 $96,000 Not Implemented
IA0476 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,431 $17,319 Not Implemented
IA0476 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $1,471 $2,422 Not Implemented
IA0476 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,805 $2,292 Not Implemented
IA0476 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,361 $918 Implemented
IA0476 # 05 Y:2012 05 2012 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,225 $979 Not Implemented
IA0476 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,064 $3,948 Not Implemented
BD0400 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,912 $30,000 Not Implemented
BD0400 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $15,065 $27,000 Not Implemented
BD0400 # 03 Y:2011 03 2011 USE RADIANT HEATER FOR SPOT HEATING $12,072 $12,600 Implemented
BD0400 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,389 $20 Implemented
BD0400 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,217 $1,600 Implemented
BD0400 # 06 Y:2011 06 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,214 $10,450 Implemented
BD0400 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,602 $2,039 Implemented
BD0400 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $2,250 $1,058 Implemented
GT0877 # 01 Y:2010 01 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $250,000 Not Implemented
GT0874 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,133 $1,250 Implemented
GT0874 # 02 Y:2010 02 2010 USE SYNTHETIC LUBRICANT $1,632 $0 Not Implemented
GT0874 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $53,185 $6,187 Not Implemented
GT0874 # 04 Y:2010 04 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,159 $2,883 Implemented
GT0874 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,038 $20,250 Not Implemented
GT0874 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,115 $38,366 Not Implemented
GT0874 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,744 $119,989 Implemented
GT0874 # 08 Y:2010 08 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $177,900 Not Implemented
WV0411 # 01 Y:2010 01 2010 REDESIGN PROCESS $11,522 $20,345 Not Implemented