IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

112

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0254 # 04 Y:2022 04 2022 INSTALL EFFICIENT RECTIFIERS $111,422 $1,500,000 Not Implemented
IC0254 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,568 $1,800 Not Implemented
IC0254 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,289 $19,578 Not Implemented
IC0254 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,303 $4,300 Not Implemented
IC0181 # 02 Y:2011 02 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $402 Implemented
IC0181 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $600 Implemented
IC0181 # 14 Y:2011 14 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $522 $0 Implemented
IC0181 # 13 Y:2011 13 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $33 $0 Implemented
IC0181 # 11 Y:2011 11 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,962 $4,127 Implemented
IC0181 # 09 Y:2011 09 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,634 $100 Not Implemented
IC0181 # 10 Y:2011 10 2011 REPAIR OR REPLACE STEAM TRAPS $7,948 $1,458 Implemented
IC0181 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $717 $2,886 Implemented
IC0181 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $533 $0 Implemented
IC0181 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91 $29 Implemented
IC0181 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,391 $4,830 Implemented
IC0181 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,167 $1,700 Implemented
IC0181 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,382 $0 Implemented
IC0181 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $282 $479 Not Implemented
BD0374 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $15,507 $18,616 Not Implemented
BD0374 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,840 $11,833 Not Implemented
BD0374 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,008 $3,000 Implemented
BD0374 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,533 $35 Not Implemented
BD0374 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,128 $62 Not Implemented
BD0374 # 11 Y:2010 11 2010 MINIMIZE WATER USAGE $31,680 $1,800 Not Implemented
BD0374 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,878 $3,500 Not Implemented