Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
897
matching recommendationsNAICS | 332999 | All Other Miscellaneous Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0386 # 11 Y:2006 | 11 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,887 | $24,500 | Not Implemented |
MA0597 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $25,107 | $85,300 | Not Implemented |
MA0597 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,984 | $17,660 | Implemented |
MA0597 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $5,643 | $17,818 | Implemented |
MA0597 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $4,902 | $1,000 | Implemented |
MA0597 # 05 Y:2006 | 05 | 2006 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $3,292 | $19,000 | Not Implemented |
MA0597 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $2,161 | $668 | Implemented |
MA0597 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,402 | $0 | Implemented |
MA0597 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $909 | $775 | Not Implemented |
UM0292 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,731 | $23,005 | Not Implemented |
UM0292 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,368 | $5,000 | Implemented |
UM0292 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,782 | $480 | Implemented |
UM0292 # 04 Y:2005 | 04 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,943 | $50 | Implemented |
UM0292 # 05 Y:2005 | 05 | 2005 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $1,193 | $3,000 | Not Implemented |
UM0292 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $821 | $368 | Not Implemented |
MI0117 # 01 Y:2005 | 01 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,898 | $1,350 | Implemented |
MI0117 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,463 | $11,400 | Implemented |
MI0117 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,012 | $906 | Implemented |
MI0117 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,621 | $56 | Not Implemented |
MI0117 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,044 | $5,024 | Not Implemented |
AM0489 # 01 Y:2005 | 01 | 2005 | MODIFY CURRENT INCENTIVE PROGRAM | $6,000 | $6,000 | Not Implemented |
AM0489 # 02 Y:2005 | 02 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,140 | $0 | Implemented |
AM0489 # 03 Y:2005 | 03 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,500 | $5,200 | Implemented |
AM0489 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,760 | $1,000 | Implemented |
AM0489 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,700 | $500 | Not Implemented |