IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

897

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0386 # 11 Y:2006 11 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,887 $24,500 Not Implemented
MA0597 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $25,107 $85,300 Not Implemented
MA0597 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,984 $17,660 Implemented
MA0597 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,643 $17,818 Implemented
MA0597 # 04 Y:2006 04 2006 REDUCE VENTILATION AIR $4,902 $1,000 Implemented
MA0597 # 05 Y:2006 05 2006 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $3,292 $19,000 Not Implemented
MA0597 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $2,161 $668 Implemented
MA0597 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,402 $0 Implemented
MA0597 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $909 $775 Not Implemented
UM0292 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,731 $23,005 Not Implemented
UM0292 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,368 $5,000 Implemented
UM0292 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $480 Implemented
UM0292 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,943 $50 Implemented
UM0292 # 05 Y:2005 05 2005 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,193 $3,000 Not Implemented
UM0292 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $821 $368 Not Implemented
MI0117 # 01 Y:2005 01 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $16,898 $1,350 Implemented
MI0117 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,463 $11,400 Implemented
MI0117 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,012 $906 Implemented
MI0117 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,621 $56 Not Implemented
MI0117 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,044 $5,024 Not Implemented
AM0489 # 01 Y:2005 01 2005 MODIFY CURRENT INCENTIVE PROGRAM $6,000 $6,000 Not Implemented
AM0489 # 02 Y:2005 02 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,140 $0 Implemented
AM0489 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,500 $5,200 Implemented
AM0489 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $1,000 Implemented
AM0489 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,700 $500 Not Implemented