IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

897

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0488 # 01 Y:2005 01 2005 MODIFY WORKLOAD $12,700 $9,000 Implemented
AM0488 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $1,000 Implemented
AM0488 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,850 $13 Not Implemented
AM0488 # 04 Y:2005 04 2005 MODIFY WORKLOAD $4,200 $15,000 Not Implemented
AM0488 # 05 Y:2005 05 2005 INSTALL SKYLIGHTS $2,215 $10,700 Implemented
AM0488 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,290 $6,576 Implemented
AM0488 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $1,910 $0 Not Implemented
AM0488 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,600 $150 Implemented
AM0488 # 09 Y:2005 09 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,500 $0 Implemented
AM0488 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $930 $460 Implemented
AM0488 # 11 Y:2005 11 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $206 $0 Not Implemented
UD0714 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $14,094 $5,000 Not Implemented
UD0714 # 02 Y:2005 02 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $13,500 $10,000 Not Implemented
UD0714 # 03 Y:2005 03 2005 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $12,150 $1,000 Implemented
UD0714 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $6,825 $3,000 Implemented
UD0714 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,482 $2,000 Not Implemented
UD0714 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,427 $14,204 Not Implemented
UD0714 # 07 Y:2005 07 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,772 $165 Implemented
UD0714 # 08 Y:2005 08 2005 USE MINIMUM SAFE OVEN VENTILATION $1,972 $150 Implemented
UD0714 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $1,311 $1,200 Implemented
UD0714 # 10 Y:2005 10 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,296 $0 Implemented
UD0714 # 11 Y:2005 11 2005 MINIMIZE WATER USAGE $1,138 $350 Implemented
UD0714 # 12 Y:2005 12 2005 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,000 $4,000 Not Implemented
UD0714 # 13 Y:2005 13 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $928 $200 Not Implemented
UD0714 # 14 Y:2005 14 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $884 $330 Not Implemented