IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0295 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $843 $490 Implemented
IC0295 # 06 Y:2024 06 2024 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $16,247 $16,893 Not Implemented
IC0295 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,690 $3,413 Implemented
IC0295 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,497 $558 Implemented
IC0295 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,248 $0 Implemented
IC0295 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,828 $7,539 Not Implemented
IC0295 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,221 $6,343 Not Implemented
IC0252 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,022 $4,053 Not Implemented
IC0252 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,710 $5,524 Not Implemented
IC0252 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $16,762 $27,372 Not Implemented
IC0252 # 04 Y:2021 04 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,533 $230 Not Implemented
IC0235 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,357 $32,486 Not Implemented
IC0235 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,628 $0 Not Implemented
IC0235 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,555 $1,224 Not Implemented
IC0235 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $1,398 $3,402 Not Implemented
IP0067 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $996 $0 Implemented
IP0067 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,092 $5 Not Implemented
IP0067 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $9,360 $3 Implemented
IP0067 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,858 $765 Implemented
IP0067 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,374 $3,150 Implemented
IP0067 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $12,719 $2,549 Not Implemented
IP0067 # 07 Y:2016 07 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,896 $791 Not Implemented
IP0067 # 14 Y:2016 14 2016 INSULATE BARE EQUIPMENT $40 $167 Implemented
IP0067 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,007 $58,641 Not Implemented