Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 332999 | All Other Miscellaneous Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0296 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $669 | $200 | Not Implemented |
MZ0296 # 05 Y:2020 | 05 | 2020 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,506 | $8,000 | Not Implemented |
MZ0296 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,596 | $6,400 | Not Implemented |
MZ0296 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $924 | $1,200 | Not Implemented |
MZ0296 # 06 Y:2020 | 06 | 2020 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $100,865 | $197,145 | Not Implemented |
MZ0296 # 04 Y:2020 | 04 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,669 | $288 | Not Implemented |
MZ0296 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $336 | $360 | Not Implemented |
MZ0296 # 07 Y:2020 | 07 | 2020 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $57,876 | $199,418 | Not Implemented |
MZ0286 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,970 | $2,000 | Implemented |
MZ0286 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,749 | $480 | Not Implemented |
MZ0286 # 02 Y:2020 | 02 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,624 | $9,088 | Implemented |
MZ0286 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,656 | $8,200 | Not Implemented |
MZ0286 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,616 | $13,442 | Not Implemented |
MZ0286 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $118 | $200 | Not Implemented |
MZ0286 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $238 | $40 | Not Implemented |
MZ0234 # 01 Y:2017 | 01 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $407 | $2,000 | Implemented |
MZ0234 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,800 | $0 | Implemented |
MZ0234 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $1,354 | $1,550 | Implemented |
MZ0234 # 04 Y:2017 | 04 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,248 | $5,940 | Not Implemented |
MZ0234 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,596 | $0 | Not Implemented |
MZ0234 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,361 | $50 | Implemented |
MZ0062 # 13 Y:2011 | 13 | 2011 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $91 | $300 | Implemented |
MZ0062 # 12 Y:2011 | 12 | 2011 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $62 | $60 | Not Implemented |
MZ0062 # 06 Y:2011 | 06 | 2011 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $89,844 | $250,000 | Not Implemented |
MZ0062 # 05 Y:2011 | 05 | 2011 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $866 | $1,498 | Not Implemented |