IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0269 # 01 Y:2022 01 2022 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $24,682 $2,000 Not Implemented
TT0269 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,069 $25,000 Not Implemented
TT0269 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,223 $27,500 Not Implemented
TT0269 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $3,500 Not Implemented
TT0269 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,648 $2,500 Not Implemented
TT0269 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,911 $11,000 Not Implemented
TT0221 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,132 $36,211 Implemented
TT0221 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $4,069 $2,280 Not Implemented
TT0221 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,958 $7,400 Not Implemented
TT0221 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,435 $30 Not Implemented
TT0221 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $33 $80 Not Implemented
TT0116 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $1,609 $5,920 Not Implemented
TT0116 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $837 $763 Not Implemented
TT0116 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,077 $700 Not Implemented
TT0116 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,073 $12,258 Implemented