IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,802

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0095 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $1,500 Implemented
UF0617 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,015 $12,416 Implemented
UF0617 # 08 Y:2024 08 2024 IMPROVE SPACE COMFORT CONDITIONING $904 $1,752 Implemented
UF0617 # 04 Y:2024 04 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,230 $5,280 Implemented
UF0617 # 05 Y:2024 05 2024 REDUCE GLAZED AREAS IN BUILDINGS $1,046 $1,720 Implemented
UF0617 # 07 Y:2024 07 2024 AUTOMATE FINISHING PROCESS $74,880 $100,000 Implemented
UD1086 # 02 Y:2024 02 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $573 $0 Implemented
UD1086 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $561 $0 Implemented
MI0442 # 02 Y:2024 02 2024 METER WASTE WATER $13,483 $956 Implemented
MI0442 # 01 Y:2024 01 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $16,134 $240 Implemented
MI0442 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,002 $70 Implemented
UD1084 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,386 $0 Implemented
UD1084 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $3,775 Implemented
UU0247 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,060 $1,950 Implemented
UU0247 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $864 $7,540 Implemented
UU0247 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $5,970 $3,000 Implemented
WV0660 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,000 $9,158 Implemented
WV0660 # 04 Y:2024 04 2024 INSTALL SET-BACK TIMERS $8,713 $1,125 Implemented
WV0660 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $8,339 $2,225 Implemented
WV0660 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,956 $1,323 Implemented
WV0660 # 09 Y:2024 09 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $383 $104 Implemented
WV0660 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,033 $2,884 Implemented
WV0660 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,979 $4,576 Implemented
GT0976 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $375 $200 Implemented
SU0550 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $758 $80 Implemented