Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,802
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0972 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,131 | $1,850 | Implemented |
GT0972 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,730 | $400 | Implemented |
CM1024 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,832 | $36,480 | Implemented |
CM1024 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,939 | $6,474 | Implemented |
CM1024 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,381 | $291,962 | Implemented |
UU0227 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,169 | $10,776 | Implemented |
UU0227 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,325 | $78,840 | Implemented |
UU0227 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,103 | $7,349 | Implemented |
UU0227 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,358 | $13,337 | Implemented |
UU0227 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,776 | $3,465 | Implemented |
UU0227 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,564 | $7,061 | Implemented |
UU0227 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $4,289 | $9,282 | Implemented |
UU0227 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,237 | $6,000 | Implemented |
UU0227 # 10 Y:2023 | 10 | 2023 | MINIMIZE WATER USAGE | $2,457 | $2,652 | Implemented |
UU0227 # 12 Y:2023 | 12 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $53 | $333 | Implemented |
WV0651 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,789 | $14,056 | Implemented |
WV0651 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,830 | $2,314 | Implemented |
WV0651 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $846 | $228 | Implemented |
WV0651 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $430 | $217 | Implemented |
WV0651 # 11 Y:2023 | 11 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $140 | $656 | Implemented |
NL0080 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,794 | $120 | Implemented |
NL0080 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,846 | $4,160 | Implemented |
NL0080 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,163 | $4,000 | Implemented |
NL0080 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $754 | $660 | Implemented |
NL0080 # 07 Y:2023 | 07 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $423 | $844 | Implemented |