IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0155 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $2,516 Implemented
IP0155 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,289 $1,882 Implemented
IP0155 # 07 Y:2022 07 2022 USE PHOTOCELL CONTROLS $152 $456 Implemented
IP0155 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,832 $0 Implemented
IP0155 # 04 Y:2022 04 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $13,401 $740 Implemented
IP0155 # 05 Y:2022 05 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,705 $1,518 Implemented
IP0155 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,553 $131 Implemented
IP0155 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,118 $0 Implemented
IC0249 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,949 $440 Implemented
IC0249 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,067 $0 Implemented
IC0249 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,374 $4,100 Implemented
IP0132 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $711 $47 Implemented
IP0132 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,251 $64 Implemented
IP0128 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $2,633 $1,575 Implemented
IP0128 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,549 $36,977 Implemented
IP0128 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,334 $76 Implemented
IP0128 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $331 $0 Implemented
IP0118 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,954 $824 Implemented
IP0118 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,154 $1,526 Implemented
IP0118 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,021 $10,215 Implemented
IP0045 # 03 Y:2015 03 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $25,783 $1,054 Implemented
IP0045 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,242 $417 Implemented
IP0045 # 05 Y:2015 05 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,201 $17,250 Implemented
IP0045 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $401 $0 Implemented
IP0045 # 01 Y:2015 01 2015 APPLY FOR INVESTMENT INCENTIVES $1,605 $0 Implemented