IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2212 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $405 $0 Implemented
UW2212 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,231 $0 Implemented
BS0051 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,969 $3,393 Implemented
BS0051 # 03 Y:2015 03 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $638 $259 Implemented
BS0051 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $1,280 Implemented
BS0042 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,472 $8,031 Implemented
BS0042 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,441 $42,000 Implemented
BS0042 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,955 $450 Implemented
BS0042 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,973 $3,120 Implemented
BS0042 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,494 $175 Implemented
BS0011 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $4,008 $6,725 Implemented
BS0011 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $250 $600 Implemented
BS0011 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,102 $973 Implemented
UW0004 # 01 Y:2007 01 2007 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $13,962 $8,762 Implemented
UW0004 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,182 $25,800 Implemented
OR0513 # 01 Y:2007 01 2007 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $13,700 $5,000 Implemented
OR0513 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $1,700 Implemented
OR0513 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,300 $800 Implemented
OR0498 # 01 Y:2006 01 2006 COVER OPEN TANKS $7,300 $3,600 Implemented
OR0498 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $2,300 Implemented
OR0498 # 05 Y:2006 05 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $600 $400 Implemented
OR0498 # 06 Y:2006 06 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,400 $20,000 Implemented
OR0498 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,600 $17,400 Implemented