IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,235

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0903 # 04 Y:2015 04 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,633 $30,000 Implemented
OK0903 # 05 Y:2015 05 2015 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $407 $1,125 Not Implemented
OK0903 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,717 $11,876 Not Implemented
OK0903 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $2,170 $8,887 Not Implemented
OK0903 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,490 $2,440 Not Implemented
OK0903 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,183 $950 Implemented
OK0903 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,904 $10,062 Implemented
OK0903 # 11 Y:2015 11 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,427 $2,112 Not Implemented
OK0903 # 12 Y:2015 12 2015 INSULATE BARE EQUIPMENT $195 $240 Not Implemented
MI0272 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $108,119 $1,400 Not Implemented
MI0272 # 02 Y:2015 02 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,120 $60,000 Not Implemented
MI0272 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,227 $27,707 Implemented
MI0272 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,994 $80 Not Implemented
MI0272 # 05 Y:2015 05 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,265 $11,000 Not Implemented
MI0272 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,714 $2,680 Not Implemented
MI0272 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,059 $373 Not Implemented
MI0272 # 08 Y:2015 08 2015 USE PHOTOCELL CONTROLS $1,053 $360 Not Implemented
MI0272 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $811 $3,060 Implemented
MI0272 # 10 Y:2015 10 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $727 $2,044 Not Implemented
MI0272 # 11 Y:2015 11 2015 USE OPTIMUM THICKNESS INSULATION $88 $360 Not Implemented
MI0271 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $49,400 $1,400 Not Implemented
MI0271 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $32,947 $40,065 Not Implemented
MI0271 # 03 Y:2015 03 2015 MINIMIZE WATER USAGE $15,193 $16,600 Implemented
MI0271 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,862 $3,960 Not Implemented
MI0271 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,939 $1,660 Not Implemented