IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0381 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $293 Implemented
MS0381 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,659 $34,108 Not Implemented
MS0381 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $264 $317 Not Implemented
MS0381 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,709 $57,080 Not Implemented
MS0381 # 05 Y:2011 05 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,990 $12,600 Implemented
MS0381 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,037 $8,580 Implemented
OK0815 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,281 $13,000 Not Implemented
OK0815 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,351 $0 Implemented
OK0815 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,341 $930 Implemented
OK0815 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $950 Implemented
OK0815 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $2,608 $2,198 Not Implemented
OK0815 # 06 Y:2011 06 2011 DISCONNECT BALLASTS $849 $696 Not Implemented
OK0815 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,876 $3,096 Not Implemented
OK0815 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,335 $20,544 Not Implemented
OK0815 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $3,531 $633 Implemented
NC0432 # 01 Y:2011 01 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $14,064 $24,000 Not Implemented
NC0432 # 02 Y:2011 02 2011 REPAIR FAULTY LOUVERS AND DAMPERS $7,824 $2,500 Implemented
NC0432 # 03 Y:2011 03 2011 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $1,290 $3,700 Not Implemented
NC0432 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,640 $600 Implemented
NC0432 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $177 Implemented
NC0432 # 06 Y:2011 06 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,893 $72,000 Not Implemented
NC0432 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $8,060 $30,000 Not Implemented
NC0432 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,236 $8,420 Implemented
NC0432 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $53,906 $1,000 Not Implemented
UA0065 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,459 $24,444 Not Implemented