IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0639 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,761 $65,000 Not Implemented
MA0639 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,993 $70,840 Implemented
MA0639 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,064 $17,800 Not Implemented
MA0639 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $16,180 $0 Not Implemented
MA0639 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,735 $15,500 Not Implemented
MA0639 # 06 Y:2008 06 2008 INSTALL TIMERS AND/OR THERMOSTATS $12,707 $975 Implemented
MA0639 # 07 Y:2008 07 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,426 $27,000 Implemented
MA0639 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $717 $1,000 Not Implemented
MA0639 # 09 Y:2008 09 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $716 $0 Not Implemented
MA0639 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $322 $2,000 Implemented
IC0140 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $4,032 Not Implemented
IC0140 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $1,133 Not Implemented
IC0140 # 03 Y:2008 03 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,321 $0 Not Implemented
IC0140 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $1,940 Not Implemented
IC0140 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,785 $2,728 Not Implemented
IC0140 # 06 Y:2008 06 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,146 $80,600 Not Implemented
IC0140 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,093 $5,980 Not Implemented
IC0140 # 08 Y:2008 08 2008 USE OPTIMUM THICKNESS INSULATION $19,374 $4,100 Not Implemented
IC0140 # 09 Y:2008 09 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $135 $0 Not Implemented
IC0140 # 10 Y:2008 10 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,616 $0 Not Implemented
IC0140 # 11 Y:2008 11 2008 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,973 $0 Not Implemented
WV0379 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,979 $113,775 Implemented
WV0379 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,378 $60,703 Implemented
WV0379 # 03 Y:2008 03 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $19,217 $2,000 Not Implemented
WV0379 # 04 Y:2008 04 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,617 $13,800 Implemented