Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,345
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0775 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $343 | $300 | Implemented |
UD0775 # 06 Y:2008 | 06 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $180 | $0 | Not Implemented |
UD0775 # 07 Y:2008 | 07 | 2008 | INSTALL SKYLIGHTS | $101 | $2,200 | Not Implemented |
UD0775 # 08 Y:2008 | 08 | 2008 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $95 | $0 | Implemented |
UD0775 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $82 | $0 | Implemented |
IA0419 # 01 Y:2007 | 01 | 2007 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,302 | $1,140 | Not Implemented |
IA0419 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $678 | $25 | Implemented |
IA0419 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,055 | $500 | Implemented |
IA0419 # 04 Y:2007 | 04 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,431 | $174 | Not Implemented |
IA0419 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $758 | $1,001 | Implemented |
IA0419 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,515 | $7,460 | Not Implemented |
IA0419 # 07 Y:2007 | 07 | 2007 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,450 | $1,200 | Implemented |
IA0419 # 08 Y:2007 | 08 | 2007 | OPTIMIZE PLANT POWER FACTOR | $19,032 | $19,062 | Not Implemented |
IA0419 # 09 Y:2007 | 09 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,583 | $3,300 | Implemented |
IA0419 # 10 Y:2007 | 10 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,325 | $800 | Implemented |
MA0629 # 01 Y:2008 | 01 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,363 | $2,800 | Implemented |
MA0629 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $1,935 | $2,100 | Not Implemented |
MA0629 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,726 | $6,800 | Not Implemented |
MA0629 # 04 Y:2008 | 04 | 2008 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $1,367 | $3,000 | Not Implemented |
MA0629 # 05 Y:2008 | 05 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $450 | $1,620 | Implemented |
MA0629 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $351 | $400 | Implemented |
MA0629 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $247 | $200 | Implemented |
LL0287 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,840 | $30 | Not Implemented |
LL0287 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,742 | $1,120 | Not Implemented |
LL0287 # 03 Y:2008 | 03 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,155 | $456 | Implemented |