Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,634
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0049 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $79,073 | $292,302 | n/a |
OK1147 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $15,914 | $8,034 | n/a |
OK1147 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,835 | $21,094 | n/a |
OK1147 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,489 | $1,176 | n/a |
OK1147 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $17,308 | $0 | n/a |
OK1147 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,012 | $0 | n/a |
OK1147 # 03 Y:2025 | 03 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,712 | $1,080 | n/a |
OK1147 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,474 | $13,679 | n/a |
OK1147 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $687 | $0 | n/a |
MZ0378 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $196,374 | $1,560,000 | n/a |
MZ0378 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,972 | $3,500 | n/a |
MZ0378 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $4,373 | $750 | n/a |
MZ0378 # 02 Y:2025 | 02 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26,585 | $49,000 | n/a |
MZ0378 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,844 | $12,060 | n/a |
MZ0378 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,470 | $750 | n/a |
MU0068 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $972 | $26 | n/a |
MU0068 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $73,104 | $121,444 | n/a |
MU0068 # 12 Y:2025 | 12 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $728 | $22,678 | n/a |
MU0068 # 03 Y:2025 | 03 | 2025 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $829 | $473 | n/a |
MU0068 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,415 | $0 | n/a |
MU0068 # 13 Y:2025 | 13 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,362 | $24,413 | n/a |
MU0068 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $1,137 | $2,018 | n/a |
MU0068 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $585 | $3,626 | n/a |
MU0068 # 11 Y:2025 | 11 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $31 | $57 | n/a |
MU0068 # 06 Y:2025 | 06 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $529 | $0 | n/a |