IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0770 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $124 $100 Implemented
MA0770 # 04 Y:2017 04 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $286 $20 Not Implemented
MA0770 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $1,809 $2,784 Implemented
MA0770 # 01 Y:2017 01 2017 REDUCE VENTILATION AIR $8,661 $1,503 Not Implemented
MA0770 # 02 Y:2017 02 2017 AIR CONDITION ONLY SPACE NECESSARY $2,351 $1,000 Not Implemented
MA0708 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,140 $400 Implemented
MA0708 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,828 $3,200 Implemented
MA0708 # 02 Y:2013 02 2013 REDUCE VENTILATION AIR $3,194 $7,450 Not Implemented
MA0708 # 01 Y:2013 01 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,752 $30,000 Not Implemented
MA0707 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $439 $3,057 Not Implemented
MA0707 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $807 $1,840 Not Implemented
MA0707 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $972 $200 Implemented
MA0707 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,613 $1,000 Implemented
MA0707 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $412 $200 Implemented
MA0704 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,747 $9,100 Not Implemented
MA0704 # 01 Y:2013 01 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $10,351 $200 Not Implemented
MA0704 # 03 Y:2013 03 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,329 $5,680 Not Implemented
MA0704 # 04 Y:2013 04 2013 REDUCE VENTILATION AIR $2,055 $5,900 Implemented
MA0704 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,765 $500 Not Implemented
MA0704 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $2,200 Not Implemented
MA0661 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $707 $110 Implemented
MA0661 # 03 Y:2010 03 2010 REDUCE VENTILATION AIR $31,319 $17,008 Implemented
MA0661 # 06 Y:2010 06 2010 AIR CONDITION ONLY SPACE NECESSARY $2,526 $11,040 Implemented
MA0661 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $588 Implemented
MA0661 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $260 Implemented